New Build Commercial Retail

Location: Gateshead

The build incorporated a ground floor retail store with 2 above residential apartments. The project was completed within the agreed timescale despite extra variation of ground works. The foundations had to be strengthened with steel Cantilever systems and the neighbouring property had to be considerably underpinned for stabilisation. All the groundworks, drainage, specialist concrete floor systems, traditional block and brick superstructure, the mechanical and electrical with complete internal works and fit out were completed at 19 weeks.