Commercial Offices Refurbishment

Location: Gateshead

The project brief required internal demolition and complete internal refurbishment of ground floor incorporating all the various services and a new build bloc of wash communal. During the internal demolition the opening of a floor hatch revealed a large dilapidated basement area which also was refurbished. The project was successfully accomplished within the time scales irrespective of numerous extra required works.

Menu